a) Date of connection : 05-05-2014
b) Whether three phase current supplied : ----Yes----
c)I. Required kW : 7.2KW II. Available KW: 16 KW
Present Electric Load
|
16 K.W.
|
Date of Connection
|
05-05-2014
|
Connection Name
|
Principal vivekanand Pvt ITI
|
Meter No.
|
110361029868
|
Seal No.
|
2378514
|
Remarks
|
|
Sl. No |
Name of the Trade Maximum |
number of units in one shift |
Power supply required as per Norms (Kilo Watts) |
Power supply available in the Institute |
1 |
Electrician |
02 |
5.2 |
16 KW |
2 |
Fire Technology and Industrial Safety Management |
01 |
2 |
|
|
Total |
7.2 KW |